Quote:
Originally Posted by obert
Looks good. How are you getting your oxy and water into the project? Looks like a great area.
|
Couple options there. Regular run off using a pretty significant draw on the northeast corner, see topography below.
Best case scenario (at least for my patience), would be to hit a good spring, which is very likely. Third thing to consider is something the dozer guy brought up to me last week and I'll have to research a little further, but it was something about drilling down to the water table to fill. I've never read or heard of this so I'll have to look into it more before saying ok.